Project Description
The Aliabad power plant, with a capacity of 1014 MW, is located in Aliabad County, Golestan Province. The project was defined in two phases, and its construction began in 2010. Phase 1, consisting of 4 V94.2(5) gas units, each with a nominal capacity of 162 MW, and 2 V94.2(MAP2B) gas units, each with a nominal capacity of 183 MW, was completed in 2010. In phase 2, the construction of 3 steam units to convert the gas units into a combined cycle power plant is currently under construction.
| Title | phase 1 | phase 2 | phase 3 |
|---|---|---|---|
| Title | phase one | phase two | phase three |
| Unit Number and Capacity (MW) | 162*4 183*2 | 160*3 | |
| Status of the project | In operation | Under construction | |
| Approval date | 2009 March 2 | ||
| Last situation | In operation | Under construction | |
| Year of construction | 2010 | ||
| Run year | 2010 |