Project Description
The Bonyad Mostazafan building photovoltaic power plant, with a capacity of 150 kW, is located at the Bonyad Mostazafan Foundation in Tehran. This project was established in accordance with the Cabinet of Ministers’ resolution to supply 20% of the organization’s electricity requirements from renewable energy sources. Construction began in 2018, and the plant was commissioned in 2019.
| Title | phase 1 | phase 2 | phase 3 |
|---|---|---|---|
| Title | phase one | phase two | phase three |
| Unit Number and Capacity (MW) | 150KW | ||
| Status of the project | In operation | ||
| Approval date | 2018 | ||
| Last situation | In operation | ||
| Year of construction | 2018 | ||
| Run year | 2019 |