Bonyad Mostazafan CCHP Power Plant

Start date of the project

2020

Project Description

The Bonyad Mostazafan CCHP power plant is defined in two phases; the construction of the first phase, with a capacity of 1.5 MW, commenced in 2018 and was commissioned in 2021. The second phase, also with a capacity of 1.5 MW, is currently under construction. This power plant provides simultaneous electricity, heat, and cooling for the Bonyad Mostazafan of Islamic Revolution headquarters. It operates with high efficiency by recovering exhaust flue gas heat for the heating and absorption chiller cooling systems.

Title phase 1 phase 2 phase 3
Titlephase onephase twophase three
Unit Number and Capacity (MW)1.5MW1.5MW
Status of the projectIn operationUnder construction
Approval date2016 December 26
Last situationIn operationUnder construction
Year of construction2021
Run year