Project Description
The Bonyad Mostazafan CCHP power plant is defined in two phases; the construction of the first phase, with a capacity of 1.5 MW, commenced in 2018 and was commissioned in 2021. The second phase, also with a capacity of 1.5 MW, is currently under construction. This power plant provides simultaneous electricity, heat, and cooling for the Bonyad Mostazafan of Islamic Revolution headquarters. It operates with high efficiency by recovering exhaust flue gas heat for the heating and absorption chiller cooling systems.
| Title | phase 1 | phase 2 | phase 3 |
|---|---|---|---|
| Title | phase one | phase two | phase three |
| Unit Number and Capacity (MW) | 1.5MW | 1.5MW | |
| Status of the project | In operation | Under construction | |
| Approval date | 2016 December 26 | ||
| Last situation | In operation | Under construction | |
| Year of construction | 2021 | ||
| Run year |